VinFast Ha Tinh boasts a warehouse spanning 65,000 m², placing high demands on the organization and utilization of storage space. To meet this need, 950 sets of Selective heavy-duty racking systems were deployed, featuring a 7.5m high, 5-tier configuration with a load capacity of 2,500 kg per tier. This was not just a large-scale warehouse racking project, but also a challenge in terms of uniformity, load-bearing capacity, and operational efficiency within a modern industrial warehouse system.
Overview of the VinFast Ha Tinh industrial shelving project.
The project is being built on a warehouse site spanning 65,000 square meters. This is a large enough scale that zoning and arranging storage locations becomes a crucial part of the operational plan.
Instead of utilizing only floor space, the shelving system is designed vertically to maximize space utilization. The storage levels are clearly divided, facilitating the organization of goods by group, product code, or intended use.
- Project Name : Implementation of industrial shelving system for VinFast in Ha Tinh
- Installation location : Lots CN4-1, CN4-2, CN4-3, Central Industrial Zone, Vung Ang Economic Zone, Ha Tinh Province
- Warehouse area : The storage warehouse has a size of 65,000 m².
- Type of racking used : Heavy-duty Selective racking
- Dimensions : Height 7,500mm, Length 2,880mm, Width 900mm
- Design : The system consists of 5 storage levels.
- Design load : 2,500 kg/floor
- Deployment scale : 950 shelving units
With this configuration, each shelving unit is arranged into multiple vertical storage positions, thereby increasing storage capacity without the need for continuous expansion of floor space.

VinFast and the challenge of organizing a large-scale warehouse.
VinFast’s growth is not only reflected in its electric vehicle production but also in the need to improve the logistics infrastructure behind the factory. As production scale expands, the amount of raw materials, components, parts, and goods that need to be received and stored also increases, requiring warehouse space to be meticulously planned from the outset.
In the Vung Ang Economic Zone, Ha Tinh province, the construction of a large-scale warehouse system plays a crucial role in VinFast’s production operation chain. A professional warehouse not only needs a large area but also must solve the problem of arranging space, zoning goods, utilizing vertical space, and ensuring convenient import and export processes.
In the automotive manufacturing sector, stored goods can vary widely in type, size, and weight. Therefore, the storage system needs to be designed to suit the load capacity, lifting equipment, and actual operating frequency, while also ensuring operational stability.
This is also why industrial warehouse racking systems are one of the crucial elements when organizing storage space in large-scale production warehouses. A properly designed racking system not only helps to make good use of floor space but also creates clear storage locations, supporting goods control and connecting more effectively with internal factory logistics operations.

The VinFast Ha Tinh project – large-scale, requiring synchronized implementation.
With 65,000m² of warehouse space and 950 sets of Selective heavy-duty racking systems, the VinFast Ha Tinh project is a remarkable undertaking in the field of industrial storage. The system is implemented with a height of 7,500mm, 5 levels, and a load capacity of 2,500kg/level, aiming to organize storage space vertically and facilitate convenient goods retrieval.
Behind those figures lies a whole series of tasks, from surveying and calculating parameters to planning the layout, manufacturing, and complete installation. Especially for warehouses spanning tens of thousands of square meters, the synchronization between design and construction is a crucial factor that needs to be emphasized from the outset.
Through this project, One Tech Rack continues to expand its capacity to deploy industrial racking systems for warehouses with high load capacity, scale, and spatial organization requirements.
Each warehouse has its own unique characteristics in terms of area, goods, and operating methods. Therefore, an effective racking solution is not necessarily the one with the most levels or the largest number of shelves, but rather the one that best suits how the business actually uses the warehouse.

Why was One Tech Vietnam chosen to implement the shelving system for VinFast?
With a warehouse spanning 65,000 m² and 950 shelving units, implementing the storage system for VinFast Ha Tinh required the contractor to simultaneously meet multiple criteria regarding production capacity, quality, technical expertise, and timeline. In particular, given the large number of shelving units, the uniformity of components and seamless coordination from design to installation played a crucial role in the entire project.
One Tech Rack possesses many factors suitable for the requirements of deploying large-scale industrial warehouse racking systems , most notably:
- The 20,000m² factory provides proactive control over the production process and the completion of the shelving system.
- Capable of fulfilling large-volume orders, suitable for projects requiring the simultaneous deployment of hundreds of shelving units.
- Strict manufacturing and quality control processes help ensure consistency among components within the same system.
- Experience in implementing industrial warehouse projects, especially those with requirements for load capacity, height, and floor area.
- Our technical and installation team provides direct support, from site surveys and consultations to layout design and complete implementation at the construction site.
The ability to coordinate according to project schedule ensures that production, transportation, and installation are organized as planned.
Participating in the deployment of the 950-unit Selective heavy-duty racking system at VinFast Ha Tinh is a significant milestone for One Tech Rack. The project also demonstrates the role of production, engineering, and construction organization capabilities when businesses implement large-scale storage systems with high demands for synchronization.

The process of deploying the shelving system at VinFast Ha Tinh.
To complete the Selective heavy-duty racking system of 950 units for VinFast Ha Tinh’s 65,000m² warehouse, One Tech Vietnam implemented the project in stages, from site survey and planning to manufacturing and actual installation. Each step was coordinated according to the technical specifications, load capacity, and operating conditions of the warehouse.
- Survey and requirements gathering : The technical team surveys the site, determines the usable area, warehouse height, goods characteristics, and storage needs to serve as the basis for developing a plan.
- Layout design and arrangement : Based on actual data, a layout plan is developed with the position of the shelving units, aisle spacing, and work areas calculated to suit the warehouse’s operational methods.
- Manufactured according to project configuration : The components of the shelving system are manufactured according to agreed-upon specifications, meeting the configuration of 7,500mm high, 2,880mm long, 900mm wide, 5 tiers, and a load capacity of 2,500kg/tier.
- Pre-shipment inspection : Components are inspected item by item before packaging and shipping, to minimize discrepancies when assembled in large quantities.
- Transportation and staging: Components are delivered to the construction site and distributed according to the deployment area, facilitating the installation process and minimizing the impact of staging on the site.
- System installation : The construction team proceeded to erect the frame, install the beams, the storage levels, and complete each row of shelves according to the agreed layout. With 950 sets, the installation process was organized by area to ensure uniformity.
- Inspection and handover : After completion, the system is reviewed for structure, installation location, and related items before being put into use.
Actual images of industrial shelving installation at the VinFast warehouse.

With 950 shelving units spread across a 65,000m² warehouse, the phased implementation allows for better control over progress, quality, and consistency of the entire system. This also provides a foundation for the completed shelving system to seamlessly integrate with storage and goods handling operations at the VinFast Ha Tinh warehouse.
If your business is preparing to build a new warehouse, expand, or renovate, don’t let the choice of shelving become an emotional decision. Let One Tech Rack survey the site and calculate the solution from the very beginning – from load capacity, height, and shelving dimensions to layout and forklift aisles.
Contact One Tech Rack today for an on-site survey, configuration consultation, 2D/3D layout design, and the development of shelving solutions tailored to your business’s area and storage needs. The larger the warehouse, the more carefully the solution needs to be planned – start with the right design.